Selected Case Studies

Jet aero-engine
Lean Manufacturing Aerospace

Cellular Manufacturing — HAL Engine Division

Client: Hindustan Aeronautics Limited (HAL), Engine Division, Bangalore
Product: Aero-engines

HAL's Engine Division was producing critical aero-engine components in a traditional job-shop layout, resulting in long lead times, high work-in-progress inventory, and limited visibility of flow. Kaul & Associates designed and implemented a cellular manufacturing arrangement, grouping machines and people around component families. The new cells dramatically shortened the physical distance materials travelled, reduced queue times between operations, and created accountability for quality at each stage of production. Training and Kaizen workshops ensured the workforce understood and owned the new way of working.

Key Interventions

  • Component family analysis
  • Cell layout design
  • Flow path optimisation
  • Operator cross-training
  • Kaizen workshops
Solar panel installation
Lean Manufacturing Energy

Factory Layout Redesign — Tata BP Solar

Client: Tata BP Solar, Bangalore
Product: Solar Panels

Tata BP Solar's existing plant layout had evolved organically and created significant material handling waste, long travel distances, and production bottlenecks. Kaul & Associates conducted a systematic analysis of material flows and value streams, then designed a revised layout guided by Lean flow principles. The new arrangement aligned the physical flow of materials with the sequence of manufacturing operations, reduced handling effort, improved space utilisation, and created clearer visual management of production status across the facility.

Key Interventions

  • Value stream mapping
  • Material flow analysis
  • Layout simulation
  • Visual factory design
  • Implementation support
Consumer electronics manufacturing
Lean + SCM Consumer Electronics

Integrated Lean & Supply Chain Transformation — BPL Group

Client: BPL Ltd, BPL Sanyo Technologies Ltd, BPL Sanyo Utilities Ltd, Bangalore
Products: Colour Television, Audio Systems, Washing Machines

A major multi-site engagement across BPL's consumer electronics divisions. Kaul & Associates delivered Lean Manufacturing and Supply Chain & Logistics improvements simultaneously, covering product development processes, customer support operations, and Voice of Customer research. The engagement built cross-functional teams capable of sustaining and extending improvements independently, and established performance measurement systems to track progress against world-class benchmarks.

Key Interventions

  • Lean manufacturing rollout
  • Supply chain redesign
  • Product dev process
  • Voice of Customer
  • Employee involvement
Industrial pumps and piping in a process plant
Lean Manufacturing Capital Equipment

Master Plant layout — Sulzer Pumps

Client: Sulzer Pumps, Mumbai
Products: High performance pumps

Implemented a suite of Lean interventions — Make to Order flow, Master Plant Layout with Cellular Design, and a Pull System with Heijunka — to transform manufacturing operations for high-performance pumps. The programme tripled output from the same facility (₹90 Cr to ₹270 Cr), improved on-time delivery from 55% to 90%, and optimised resource utilisation while significantly reducing inventory levels.

Key Interventions

  • Lean – Make to Order
  • Master Plant Layout
  • Cellular Design
  • Pull System with Heijunka
Industrial conveyor and silo machinery representing fluid drive applications
Lean Manufacturing Industrial products

Master Plant Layout — Voith Turbo

Client: Voith Turbo India, Hyderabad
Products: Fluid Drives

Implemented a suite of Lean interventions — Plant Layout, Lean Planning Systems, Lean Transport Solutions, Lean in Office Areas, Design for Six Sigma, and TPM — across Voith Turbo's Hyderabad facility. On-time delivery improved from 60% to 95%. Sales turnover grew from ₹75 Cr to ₹205 Cr from the same plant and same manpower, EBITDA reached 37% of sales, and ROCE hit 63%. Design defect rates fell by over 50%, and equipment reliability improved markedly — after four years the bottom line was almost equal to the topline at the start, and the TPM implementation was rated the best amongst Voith Group companies globally.

Key Interventions & Results

  • Plant Layout
  • Lean Planning System
  • Lean Transport Solutions
  • Lean in Office areas
  • Design for Six Sigma
  • TPM
Construction scaffolding
Lean Manufacturing Fabrication

Plant layout and Planning system — Technocraft Industries

Client: Technocraft Industries, Murbad
Products: Scaffolding systems

Redesigned the plant layout and overhauled the production planning system for a scaffolding manufacturer operating under significant capacity and space constraints. The new layout eliminated congestion and non-value-added movement, while the planning system brought discipline and predictability to scheduling. Output tripled with no increase in manpower or floor space, and on-time delivery improved from 40% to 95%. A TPM programme is currently underway to sustain equipment reliability and build on these gains.

Key Interventions

  • New Plant Layout
  • Production Planning System
  • TPM (in progress)
Industrial control valves and pipelines
Lean Manufacturing Industrial products

Lean Transformation — Flow Link Systems

Client: Flow Link Systems, Coimbatore
Products: Control Valves for Oil & Gas

Delivered a comprehensive Lean transformation for a precision valve manufacturer supplying the oil and gas sector. A redesigned plant layout and a new Lean Planning System together lifted output from ₹100 Cr to ₹155 Cr within twelve months and moved the business from breakeven to ₹12 Cr profit. SMED implementation cut CNC machine setup times from 60 minutes to 10 minutes, freeing significant capacity, while Lean Transport Solutions streamlined internal material handling across the facility. On-time delivery improved from 35% to 95%.

Key Interventions

  • Plant Layout Redesign
  • Lean Planning System
  • SMED
  • Lean Transport Solutions

All Engagements

A complete overview of Kaul & Associates' client engagements across sectors and service lines.

S No Client Organisation
Services DeliveredBusiness Outcomes
1
BPL Ltd.
Bangalore
Consumer Durables
Colour TV
Lean – Pull SystemInventory in plant reduced from 30 days to 10 days
Lean – Supply Chain Mgt. & LogisticsInventory in warehouses reduced by 250 crores
Lean – Product Development ProcessLead time reduced from 14 months to 7 months
SMEDChangeover time on a 1300 ton Injection moulding machine reduced from 7 hours to 45 minutes
Customer Support ProcessImproved customer satisfaction
Voice of the CustomerQuality reduced from 20,000 ppm to 6,000 ppm
VOP – Employee InvolvementImproved employee engagement
2
Videocon
Aurangabad
Consumer Durables
Colour TV
Lean – FlowOutput increased by 100% from 5,000/day to 10,000/day with same manpower
SMEDChangeover time on a high speed carton printing machine reduced from 3 hours to 40 min.
Dispatch EfficiencyWaiting time for loading a 12 ton truck reduced from 3 hours to 40 min
Pull SystemInventory reduced by 80 crores. Product availability on dealer shelf significantly after implementing mixed model scheduling project "Any Model Any Time"
3
BPL Sanyo
Bangalore
Consumer Durables
Washing Machine
Lean – Pull SystemReduced inventory and instances of stock outs
Supply Chain Mgt. & LogisticsInventory in warehouses reduced
4
HAL, Engine Division
Bangalore
Aerospace & Defence
Aircraft Engine
Lean – FlowOutput of the bottleneck cell for circumferential welding increased by 100%
Cellular ManufacturingReduced transportation losses and improved quality
Planning SystemsImproved on-time delivery
5
Tata Advanced Materials
Aerospace & Defence
Composites for Aerospace & Defence
Master Plant LayoutModular layout – built on the concept of Universal modules.
Layout was recognised by Boeing executives as one of the finest layouts that they have seen anywhere in the world.
6
Tata Power – Strategic Engineering Division
Aerospace & Defence
Weapon Systems
Plant Layout – Greenfield ProjectNew plant of Rs. 10,000 crore turnover just got commissioned
7
Tata BP Solar
Bangalore
Solar
Solar Systems
Master Plant LayoutReduced the WIP by 80% and space occupied by 50%
8
IndoSolar
Greater NOIDA
Solar
Photovoltaic Cell
TPMPlant output has increased by 40%
Lean – Pull SystemStock-outs reduced, purchasing effort reduced, inventory reduced by 30%
Six Sigma Quality ImprovementCurrently in progress
9
Technocraft Industries
Murbad
Fabrication
Scaffolding Systems
New Plant LayoutOutput increased by 300% with the same manpower and space
Planning SystemOn time delivery improved from 40% to 95%
TPMCurrently in progress
10
Sulzer Chemtech
Pune
Capital Equipment
Mass Transfer Internals
Master Plant LayoutOutput increased from the same plant by 100%
Lean Planning SystemImproved on-time delivery performance and reduced lead time
Lean TransportationEliminated transportation by overhead cranes thereby improving efficiency
Plant Layout – Greenfield SiteRecently commissioned plant
11
Sulzer Pumps
Mumbai
Capital Equipment
High Performance Pumps
Lean – Make to OrderOutput increased from 90 crores to 270 crores from the same plant
Master Plant Layout – Cellular DesignOn time delivery improved from 55% to 90%
Pull System with HeijunkaOptimized resource utilization and reduced inventory
12
Burckhardt Compression
Pune
Capital Equipment
High Pressure Gas Compressors
Lean PlanningOn time delivery improved from 40% to 95%
Plant LayoutDelivered a space efficient and modular plant layout
Self-managed TeamsBrought out the spirit of team work and ownership amongst workers
SMEDSetup times on CNC machines reduced from 100 min to 20 min in a large number of fixtures
Lean in OfficeImplementation not completed
13
Tranter India
Pune
Capital Equipment
Plate Type Heat Exchangers
Plant LayoutOn time delivery improved from 45% to 95%
Lean Planning SystemInventory was reduced from 60 days to 20 days
SMEDMean lead time to deliver product reduced from 40 days to 10 days
Lean Transport SolutionsEliminated transportation by overhead cranes thereby improving efficiency
14
Tata DLT
Pune
Automotive
Low Bed Trailers for 20 & 40 Feet Containers
Plant Layout – Greenfield SiteDelivered a space efficient and modular plant layout
15
Flow Link Systems
Coimbatore
Industrial Products
Control Valves for Oil & Gas
Plant LayoutOn time delivery improved from 35% to 95%
Lean Planning SystemOutput improved from 100 cr to 155 cr in 12 months; Profits rose from zero to 12 cr
SMEDCNC machines setup time reduced from 60 min to 10 min
Lean Transport SolutionsImproved material handling efficiency
16
Voith Turbo India
Hyderabad
Industrial Products
Fluid Drives
Plant LayoutOn time delivery improved from 60% to 95%
Lean Planning SystemEBIDTA increased to 37% of Sales. ROCE @63%
Lean Transport SolutionsSales Turnover grew from 75 cr to 205 cr from the same plant and same manpower
Lean in Office AreasAfter 4 years, the bottom line was almost equal to the topline when we started
Design for Six SigmaDefect rates in designs reduced by over 50%
TPMEquipment reliability improved. Breakdowns and failures reduced. TPM implementation was rated as the best amongst group companies globally
17
Voith Paper Fabrics
Hyderabad
Industrial Products
Fabrics for Paper Machinery
Lean Planning SystemOn time delivery improved from 40% to 95%
Inventory reduced by 50%

Ready to Become Our Next Success Story?

Tell us about your manufacturing challenges. We'll tell you how we've solved them before.

Start the Conversation